Tailem Bend

Effective from Effective to Number Year Operator Issued
27/10/2016    1797  2016  GEN  27/10/2016 
 
Tailem Bend

Shunting on GWA Tracks to the east end yard limit board.

Operation of Test Switch for all movements.

Until further notice any movement traversing the North Terrace Level Crossing (119.975 km) or the Trevena Road Level Crossing (120.775 km) on the GWA line towards Pinnaroo must utilise the Test Switch to operate the crossing due to rail head contamination.

Access by rail and shunt crews to the existing ‘Push Button’ operation boxes will be withdrawn.