APPLIES TO THE FOLLOWING ROUTE: - SOMERTON LOOP TO BENALLA
SEYMOUR LOOP SWITCHLOCK SIDING LENGTH EXTENSION
Commencing from 07/08/2020 the Seymour Loop Switchlock Siding has been extended and commissioned into use.
The standing room of Seymour Loop Switchlock Siding has been extended in length from 1286 metres to 1506 metres with the end stop now located at 100.240km point. The ARTC Network Information Book for this location will be updated in due course.
Authorised by: Operations Interface, SA/Vic, Interstate Network
|