APPLIES TO THE FOLLOWING Route: West Track Birkenhead to Pelican Point
Train movements to address Rust/Contaminated Rail build up ---------------------------------------------------------------------------------- Until further notice the preferred running of trains travelling between Birkenhead and Pelican Point is as follows - From Birkenhead to Pelican Point, on the West Track. - From Pelican Point to Birkenhead, on the East Track.
Additionally the Largs North Crossover (77/77A) points should be traversed within a 72hour period.
The purpose of this is to reduce rust/contamination build up which may affect track circuits and level crossing operation. If trains have not travelled over the West Track or 77/77A points within a 72hour period, the track circuits must be re-certified by qualified staff
Authorised by Service Delivery Manager NCCW: Terry Rawson
|