NIB UPDATE VIC SOUTH WEST

Effective from Effective to Number Year Operator Issued
09/09/2020  01/12/2020  2225  2020  GEN  09/09/2020 
 
Update of Network Information Book (NIB)
- Amendments to OGW-30-05 Vic South West

Pyrenees (exc) to Newport (exc)

On 11/09/2020 ARTC will publish the amended Network Information Book (NIB) for Vic South West to version 2.0

The NIB is available on the ARTC website located at :
http://www.artc.com.au/customers/operations/nib/

Amendments to OGW-30-05 include:

- Adjacent Train Control Centres section 1.4 updated
- Parallel Running Lines section 1.5 updated
- New Interface Points section 1.6 added
- Section Operating Equipment section 1.8 updated
- Level crossing details in section 1.11 updated
- Significant Kilometre Markings section 1.16 updated
- Wayside Monitoring Systems section 1.18 updated
- Pyrenees, Ararat & Maroona information updated
- Maryborough line information updated
- Altona North refuge siding information added as detailed in Train Notice 1053-
2017
- Corrections made to various locations text and diagrams and relevant updates included on related line diagram.


Authorised by: Operations Interface, SA/Vic, Interstate Network.