SIGNAL ALTERATION KILMORE/SEYMOUR

Effective from Effective to Number Year Operator Issued
02/02/2024    245  2024  GEN  02/02/2024 
 
APPLIES TO THE FOLLOWING ROUTE:
KILMORE EAST TO SEYMOUR

SIGNALLING ALTERATION ADVICE

Monday 05/02/2024

At completion of works on the above date, new Signals will be commissioned into use on the ‘non-preferred side’ of the ARTC Standard Gauge main line. Existing Signal numbers and associated Signal Indications are unchanged as part of this work.

New signals will be installed at the below listed locations:

ES801 - 79.955km (3 metres north of previous location and on the ‘non-preferred side’)

TLK-2 - 83.054km (1 metre south of previous location and on the ‘non-preferred side’)

ES3117 - 93.511km (2 metres north of previous location and on the ‘non-preferred side’)

NOTE: eTAP, GIS, Phoenix Systems and NIB diagrams are not yet updated. Advice will be provided when all systems and diagrams are updated. Affected signals are not to be used as protecting signals for safeworking purposes until systems and diagrams are updated. A Separate Train Notice will be published when all systems and diagrams are updated.

Supporting Train Notice advertising the works: 178/2024.

ARTC Project Engineer, Tanishq Sarkar: 0436 117 695

AUTHORISED BY: Operations Interface SA/VIC, Interstate Network