APPLIES TO THE FOLLOWING ROUTE: - DRY CREEK TO CRYSTAL BROOK
LONG PLAINS GOODS SIDING
On Thursday 10/10/2024 points 11 and 17 leading from the crossing loop at Long Plains to the Goods Siding were booked out and clamped in the normal position. IBA number 2402187 issued.
The Goods Siding rail will be cut in two locations and Buffer Stops will be built on the Goods Siding at Long Plains.
AUTHORISED BY: Operations Interface SA/VIC, Interstate Network.
|