APPLIES TO THE FOLLOWING ROUTE: - SOMERTON LOOP TO ALBURY
Sisely Avenue Signage Installation
Monday 28/10/2024 ------------------------------ Between 0300hrs and 2100hrs, during the track closure for Inland Rail & other various works on Victorian North East Line as advertised in TAA1384, the following advisory signage will be installed for rail traffic movements heading towards Melbourne that have a requirement to stop at Wangaratta Platform.
Operational signage placed on both East and West lines for ‘Up’ direction which states "Stopping Trains Maximum Speed to Platform 80km/h" at 235.278km
Operational signage placed on both East and West lines for ‘Up’ direction which states "Stopping Trains Maximum Speed to Platform 50km/h" at 234.602km
Locations of existing Level Crossing Predictor Boards are unchanged.
AUTHORISED BY: Operations Interface SA/VIC, Interstate Network.
|