Moonee Pds Crk Viaduct & Adjacent C

Effective from Effective to Number Year Operator Issued
09/12/2025    2876  2025  GEN  09/12/2025 
 
APPLIES TO THE FOLLOWING ROUTE: -
TOTTENHAM TO SOMERTON

Moonee Ponds Creek Viaduct and Adjacent Curve
24.230km to 24.998km

Notice to Rail Traffic Crews
----------------------------------
Following completion of bridge and track works along the Moonee Ponds Creek Viaduct and the curve immediately beyond the Albury end of the viaduct, the track centres have been adjusted. While these centres have not significantly changed, tight clearances remain in some locations.

It is critical that all drivers strictly adhere to the following requirements:
- Do not place hands or arms outside cab windows at any time.
- Ensure all loads confirmed within clearance limits before departure.

AUTHORISED BY: Operations Interface SA/VIC, Interstate Network.