APPLIES TO THE FOLLOWING ROUTE:- SOUTHERN CROSS
Effective from 22:00 hours on Sunday 22 March 2026 the following alterations will apply for Train Control and Corridor Signaling functions and responsibilities
The Train Control function for the Southern Cross to Spion Cross section controlled by the Signaller Number 1 Box will be transferred from the Yard Master Building Southern Cross to Centrol Level 11 628 Bourke Street.
There will be no changes to phone Numbers or radio channels for Number 1 Box.
AUTHORISED BY: Operations Interface SA/VIC, Interstate Network.
|