Cherry St LXing Closed

Effective from Effective to Number Year Operator Issued
25/03/2021    736  2021  GEN  25/03/2021 
 
APPLIES TO THE FOLLOWING ROUTE: -
NEWPORT TO NORTH GEELONG

Laverton Loop to Manor Loop

CHERRY STREET LEVEL CROSSING 31.456KM

Thursday 25/03/2021

From the above date Cherry Street Level Crossing 31.456km is permanently closed to pedestrian and road vehicle access; pedestrians are now using a new underpass at Cherry Street, road vehicles are now passing over the new Geelong Road over bridge.

The Level crossing removal project will be applying bridging of the Level Crossing for ARTC only.

The level crossing componentry will be removed at a later date.

Project Manager: Chan Sarai - 0414 813 188
Signalling Manager: Akhil Chopra - 0428 966 781