Rationalisation of Standing TNs

Effective from Effective to Number Year Operator Issued
7/05/2019    924  2019  GEN  7/05/2019 
 
Process Review Rationalisation of Standing Train Notices

APPLIES TO THE FOLLOWING ROUTES:

All the EAST/WEST NETWORK covered by the Code of Practice and ARTC Addendum and TA20 Victorian Rules.

The following Standing Train Notices have been cancelled due to information updated and incorporated into the Network Information Books, the Code of Practice and ARTC Addendum, TA20 Victorian Rules, Route Access Standards, Interface Agreements or have become obsolete.

Please now reference information from the above sources.

Network Information Books:
375/2003 Intro of CTC Manor Loop/Gheringhap
814/2005 Over height Detector Islington North
2534/2008 Revised Ops Protocols WFJ/Tottenham
2563/2008 Signalling Pelican Point
2528/2009 Missing Link Commissioning
2624/2009Horsham Operating Procedures
530/2010 Coomandook Location Ahead Boards
585/2010 Yongala Level Crossing
1775/2010 Kaniva #2 Siding
1920/2010 Murray Bridge Siding Closures
2377/2010 Tintinara Location Ahead Boards
2631/2010 Keith Location Ahead Boards
2765/2010 Bolivar Location Ahead Boards
2784/2010 Dimboola Station Operations
2809/2010 Murtoa Station Operations
2965/2011 South Line Goods Loop Closures
3131/2011 Benalla/Wodonga Commissioning
3132/2011 Benalla/Wodonga Commissioning
3293/2011 Benalla relocation of home signals
3571/2011 Bordertown Location Ahead Boards
4840/2011 Grain Siding Closures Tottenham/Serviceton
4867/2011 Transfer control Albion/Jacana
5317/2011 Iluka Siding Ops
1568/2012 Wimmera Ops process
2084/2012 Wimmera Ops process
2503/2012 Berrybank Siding Alterations
2934/2012 Inverleigh Siding Operations
2955/2012 Newport/Laverton Operations
258/2013 601 Points Newport
1707/2013 Maroona Signal re-location
69/2014 Berrybank/Serviceton Grain Siding Closures
98/2014 Freight Link Track MPJ
1419/2014 Tullamarine Passing Lane Ops
1669/2014 Intro of PTOS Benalla/Oaklands
1469/2014 Melb Metro Infrastructure
1470/2014 MPJ Procedures
1926/2014 Somerton Loop Transfer & Ops
2006/2014 Melb Ports Ops 1
2007/2014 Melb Ports Ops 2
667/2015 Main Rd LX Gladstone
1054/2015 Broken Hill Yard
1789/2015 Signal Works Daipur
1956/2015 PYL Signage Alteration
424/2016 Daipur Loop Turnout Alignment
702/2016 Somerton Yard Ops
1751/2016 Sunshine Box Closure
519/2017 Jung Switch Box Removal
Code of Practice & ARTC Addendum;
1994/2005 TA’s - take main line
4469/2011 ARTC CoP Vic M/Line Ops
1132/2013 ARTC Addendum Update
1379/2013 ARTC Appendix 1, 5/10 Update
717/2015 Amendments to the CoP DIRN
1408/2016 Amendments to the CoP TOA Forms
58/2018 ARTC Addendum Update TJ/GJ
313/2018 Amendments to TWA SW6 Form
481/2018 Amendments to the CoP DIRN CAN/IBA’s
539/2018 Amendments to the CoP DIRN Emergency Auto Mode
1135/2018 Amendments to the CoP DIRN and ARTC Addendum

TA20 Victorian Rules:
2560/2009 TA20 Rules Amendments
3651/2011 TA20 Rules Amendments Passing Auto Signals
4587/2011 Re-issue Section 15 NCoP Warning Sign
4635/2011 L/X Predictors Vic
199/2012 TA20 Section 15 Rule 7 Amendments
823/2012 TA20 Section 17 Amendments
925/2012 TA20 M/Line Ops Amendments
1864/2012 TA20 Section 30 Amendments
3169/2012 TA20 M/Line Ops Amendments
1557/2013 Vic Ops Train Controllers
1819/2013 TA20 Amendments Absolute Occ Form
2010/2013 TA20 Vic M/Line Ops Amendments
1360/2014 TA20 Vic M/Line Ops Amendments
1456/2014 TA20 Amendments PTOS
1792/2014 Shunt Limit Signs PTOS
2044/2014 TA20 COP Amendments
1387/2015 TA 20 Rule Changes
1388/2015 COP Rule Changes
1483/2015 COP Amendment Correction
1484/2015 COP Amendment
1142/2018 COP Amendment Vic M/Line Ops

Route Access Standards:
1641/2007 Height Anzac Hwy/Regency Rd Bridge
1577/2008 Height Limits Crystal Brook/Broken Hill
1677/2008 Permanent Speeds Melb/Albury
2204/2008 Dry Creek/Outer Harbour Max Speeds
975/2009 Wayside Alarms East/West Corridor
379/2010 TA02 Amendment App 1
960/2010 Train Numbering & Planning
1083/2010 Albion/Jacana B/G Speed
4435/2011 Donnybrook Passing Lane Speed Restrictions
5006/2011 TA02 Amendment Permanent Speeds
882/2012 Countrylink Track Speeds
1178/2012 Jamestown 14 Points turnout speed
1231/2012 Yongala turnout upgrade
1272/2012 Dual Gauge turnout speed restriction
1291/2012 Caltowie turnout speed restriction
2740/2012 Yunta Permanent Speed Board
605/2013 RAS Manual Intro
1540/2013 RAS Manual Intro SA
1488/2014 Whyalla/Broken Hill Axle Loads
61/2016 Chiltern Speed Boards
487/2017 Whyalla Line Speed

Interface Agreements:
479/2002 Procedural Ops ARTC/Pichi Richi
380/2010 Transfer of Infrastructure Assets
1351/2013 Procedural Ops SCT Siding Bolivar

Obsolete:
1804/2005 TSR Removal Vic NE Xing Loops
2487/2008 Donnybrook Loop Ext
1174/2010 Seymour Crossing Loop abolished
1175/2010 Seymour Crossing Loop abolished
2421/2011 Violet Town Loop out of service
3083/2011 Glenrowan Loop out of use
3396/2011 Donnybrook Switch Lock out of use
3927/2011 Donnybrook Loop out of service
4386/2011 Donnybrook Commissioning Works TAA’s
729/2012 Westmere Grain Siding Booked Out
863/2012 Longwood Threfalls Lane
1673/2012 Vic Safe-working forms
367/2014 Loram SBC
2213/2014 ICE Transition
2225/2014 Entering the rail corridor - replaced by STN 666/2019
2444/2014 Decommission of non-urban train radio
462/2015 Decommission of UHF radio SA
1286/2015 Removal of Radio Channel Signs
595/2016 Daipur Loop Commissioning
2081/2016 Introduction of NIB’s
980/2017 Windamere Rd Temp Closure
1520/2017 ICE Transition Victoria
144/2018 Decommission of UHF Ch 4 Adelaide Metro
388/2018 NIB Amendments
557/2018 STN Rationalisation
652/2018 STN Rationalisation
653/2018 STN Rationalisation
660/2018 STN Rationalisation
693/2018 STN Rationalisation
697/2018 NIB Amendments
1298/2018 STN Rationalisation
1283/2018 NIB Amendments
1355/2018 NIB Amendments